Vote #76305
完了Can't reorder activities after disabling activities on a project
0%
説明
Steps to reproduce:
- Add an activity item -> it appears in the bottom of the list.
- Try to move this last item one level up -> it doesn't move.
Moving the item directly to the top works. Then you can move it one level down and up. Only the last item won't move one level up.
journals
I cannot reproduce on version:3.0.3 and version:2.6.5.
--------------------------------------------------------------------------------
I tried with version:3.0.1 and the problem is there. I will try with version:3.0.3 as soon as I have the opportunity.
Clarifications:
* This is happening in Administration -> Enumerations -> Activities (time tracking).
* The problem always happens for me after I add a new item. Trying this with the last item that you already have in this enumeration might not reproduce the problem.
* I tried with Firefox and IE: the problem happens in both.
--------------------------------------------------------------------------------
I can reproduce first time for new item on version:2.6.5, but work second time.
I cannot reproduce on version:3.0.3.
--------------------------------------------------------------------------------
I cannot reproduce on version:3.0.0.
--------------------------------------------------------------------------------
Toshi MARUYAMA wrote:
> I cannot reproduce on version:3.0.0.
Works on Windows IE/Chrome/Firefox.
--------------------------------------------------------------------------------
Tried with version:3.0.3 (default bitnami setup) - cannot reproduce the issue. Still it is happening with our production setup based on version:3.0.1. I cannot yet confirm if it is because of the version difference or because of our production data. Will confirm when we switch our production setup to 3.0.3.
--------------------------------------------------------------------------------
Now I managed to reproduce the problem with version:3.0.3 installed from the scratch (bitnami VM image with no previous data). It happens when you define a project with a custom set of activities (disable some activities).
This is what I did:
* I set these activities in Administration -> Enumerations (in this order):
** Design (Active=OFF)
** Development (Active=ON)
* Create a project and set in Project -> Settings -> Activities:
** Design (Active=ON)
** Development (Active=OFF)
* Go back to Administration -> Enumerations.
* Add activity "Testing". It will be added at the end of the list.
* Move "Testing" one level up. Will not move. <- *THIS IS THE PROBLEM*
* Go again to the previous Project -> Settings -> Activities. Note that ii shows the order (Design, Testing, Development). *IT SEEMS THAT MOVING THE ACTIVITIES IN ADMINISTRATION AFFECTS INSTEAD THE ORDER IN THIS PROJECT*.
So it looks like version:3.0.3 is affected too.
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
This problem was indeed caused by overrides at projet level. It should be fixed in r14627.
If your positions are messed up (not sequential), this will be fixed after the first reodering.
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
related_issues
relates,Closed,20117,Activities set as inactive missing in spent time report filter